Upcoming Projects

  1. Clarifier drive replacement, replacing the current gear drives that are 33 years old.
  2. Grit classifier replacement, for better grit removal to protect downstream components.
  3. Installation of new screw press to replace our current bio-solids dewatering belt filter press.  Our current belt filter press was installed in 1985.
  4. Installation of a new 500Kw generator for Mckisic lift station.
  5. Replacement of the motor control center that operates the major components in the facility.  These components are also 33 years old.