News Flash

Posted on: July 18, 2018

Lane Closure – Medical Center Parkway

Under Construction

Bentonville, AR…..The south bound left turn lane of Medical Center Parkway at SE Walton Boulevard will be closed on Friday, July 20, 2018, beginning at 9:00 am, for sign installation. The lane will reopen by 4:00 pm the same day.

Detour signs will be in pl...

Read on...

Road Construction
Posted on: July 17, 2018

Street Closure – Southeast “E” Street

Under Construction

Bentonville, AR…..SE “E” Street between 5th Street and 7th Street will remain closed for utility construction. Said closure will reopen by Friday, July 27, 2018, at 6:00 pm.

Detour signs will be in place. Weather or other unforeseen circumstances could pos...

Read on...

Road Construction
Posted on: July 5, 2018

Temporary Street Closure – NE “J” Street

Under Construction

Bentonville, AR…..Northeast “J” Street, between NE 2nd Street and NE John DeShields Blvd., will be closed for road construction beginning at 7:00 am, on Monday, July 9, 2018, and will reopen by 6:00 pm on Friday, July 20, 2018.

Detour signs will be in plac...

Read on...

Road Construction
Posted on: June 13, 2018

One-Lane Flagging Operation – NW “A” Street

Under Construction

Bentonville, AR…..There will be a one-flagging operation at NW “A” Street, between 1990 NW “A” Street and Leopard Lane, beginning Monday, June 18, 2018, thru Friday, July 27, 2018. Said closure will begin at 7:00 am and re-open by 5:00 pm each day.

Detour ...

Read on...

Road Construction